Background

Alibaba Group Holding Limited is a Chinesemultinational e-commerce conglomerate  thatprovides  business-to-business sales servicesvia web portals. The Zhangbei Data Center, which covers about 32.95 acres, will cost around 6 billion CNY and host more than 100,000 servers. It is the second could data center of Alibaba and will 100% renewable energy. The data center building is covered by solar panels, the green energy can be switched to the computing resources by using the free air cooling and natural water cooling.

 

alibaba logo.jpg

 

Challenges and goals

◆  Need to support input load up to 63A and high density outlets up to 28 ports;

◆  PDU required to withstand the high temperature in the Hot-Aisle container system;

◆  Different PDU colors for easy identification and management;

  

Solutions

63A input PDU with 28×C13 outlet;

◆  Deployed the patent main-branch-line internal wiring which is favorable for high current input.

◆  Internal structure have a larger space with good heat dissipation.

◆  High reliability of the terminal connector for easy temperature-raise measurement.

◆  Yellow and black chassis PDU provided for easy management.

 

Benefits

◆  Meet the customer’s unique requirement, different PDU colors for easy management.

◆  PDU has a better heat dissipation to avoid hot spot in the rack.

◆  Safe, clean and tidy, energy saving.