  Services > Case Study

Case Study

Background

The Baidu is the largest Chinese search engine in the world. The new Data Center in Shunyi cost about 63 million US dollars and its total area is 46,860 square meters. The planned construction area is about 104403 square meters.

 

baidu logo.jpg

 

Challenges and goals

◆  Input load has to be up to 63A and 80A;

◆   Require low profile design & Colored chassis for easy power source identification;

  

Solutions

◆  Customized 80A input PDU;

 

Benefits

◆    Meet the high density output and support high power equipment in the cabinet;

◆  PDUs are embedded in the installation and make sure socket and cabinet frame in the same level;

◆  Provided visual control of power feeds and easy identification;