Background

The Guiyang City Rail Transit Line 2 Phase I / Phase 2 project has a total length of 13.00km, of which the underground line is 9.83km long and the elevated and transition sections are 3.17km long. A total of 8 stations (6 underground stations and 2 elevated stations Stations), the average station spacing is 1574m, the maximum station spacing is 3171m, and the minimum station spacing is 849m. The total investment of the preliminary design estimate is approximately RMB 7963.1084 million (the number of projects: 787 smart PDUs.

 

 575x289贵阳轨道交通.jpg

Challenges and goals

◆  PDU should be able to remotely monitor each individual outlet voltage, current, power and energy consumption;

◆  PDU outlets should be remotely switchable,PDU should support threshold setting and alarming;

◆ PDU should record alarm log and operation log;

◆ PDU should be able to be integrated with DCIM platform;

  

Solutions

◆  RPDU

  

Benefits

◆   In the rail transportation industry, there are many remote sites, the controlling room of each site is far away, the management cost is large and it is not timely. The application of Clever Intelligent RPDU can concentrate all data in the general control room and grasp real-time data from remote sites, while reducing manual operation and maintenance costs.